Skip to main content


http://www.firstwindblog.com/a-day-in-the-life-as-a-bull-hill-wind-operator/

"Two SunEdison employees and six Vestas employees work at Bull Hill daily..."

"An average [311 foot] turbine climb takes around 10 minutes and is performed two to four times per week."

Hypothesis https://hypothes.is/a/4pSbWRxBRZS9EU0rVaL79Q
"Forexample, in a 2–MW wind turbine, the weight of the rotorand the tower is typically about 250 tons [10]. As reportedbelow, a kite generator of the same rated power can beobtained using a 500–m2kite and cables 1000–m long, witha total weight of about 2 tons only."
Is this a reasonable claim?

"in a 2–MW wind turbine, the weight of the rotor and the tower is typically about 250 tons [...] a kite generator of the same rated power can be obtained using a 500–m2 kite and cables 1000–m long, witha total weight of about 2 tons only."

http://www.dariopiga.com/Papers/Conference/ICREGA2010Kite.pdf

Air to air


Fantastic Air to Air A330 to A330 over the Atlantic!
https://www.youtube.com/watch?v=XDA0dL5Jvu8&feature=relmfu&app=desktop

Overtaking a Lufthansa Cargo MD11
https://www.youtube.com/watch?v=c58evspEf7A

Boeing 777 (KLM) Chased by 2 Orange F16's!
https://www.youtube.com/watch?v=0SOvRVGQZ-c